Brands and countries

BENEFITS

  • Easy to use
  • Odorless
  • Fast drying: 30 minutes

CHARACTERISTICS

  • Color: White                                                                
  • Curing time: 30min on absorbent surfaces 60 minutes on non-absorbent surfaces
    Coverage: 100 to 150 g/m²

APPLICATION

GRIP A310 PROJECT is applied with a roller at a rate of 100 to 150 g/m²/coat. On very absorbent surfaces, two passes may be necessary necessary, spaced out for 1 hour. Allow to dry for 30 to 60 minutes depending on the porosity of the support and the conditions at the time of application. The dry primer must be covered within 24 hours of application.

Usage examples
Discover all Projects

Istanbul Airport
Discover More
Istanbul Airport
bostik-global-project-istanbul-airport-3000x1997.jpg
Ataturk Culture Center
Discover More
Ataturk Culture Center
bostik-global-project-ataturk-culture-2-640x480.png
Belgrade Nikola Tesla Airport
Discover More
Belgrade Nikola Tesla Airport
bostik-global-project-belgrade-airport-2-640x480.jpg
Discover our other Floor Preparation products

HYTEC E736 TURBO
Discover More
bostik-global-product-hytec-e736-640x480.jpg
Top